mirror of
https://github.com/zed-industries/zed.git
synced 2026-11-23 00:50:35 +01:00
007aba89bf
when a resizing configure event is throttled (skipped to limit redraws to once per vblank) the xdg_surface serial was never acknowledged. the early return bypassed the ack_configure call that follows the throttle check, violating the xdg-shell protocol requirement that every configure serial be acknowledged before the next surface commit. fix by calling ack_configure before the early return so the compositor always receives the acknowledgment, dosent matter whether the resize itself is applied. Release Notes: - N/A